Project Profile
Northwest Ohio Manufacturing Plant, Archbold OH
A 220,000+ sq. ft. silicone roof restoration completed in under two months — beating the October coating deadline.
Location
Archbold, OH
Roof Area
220,000+ sq. ft.
System
838 Silicone Restoration
Warranty
10-Year Material & Labor
Project Overview
220,000 Sq. Ft. Restored Before The Weather Closed In
This large-scale silicone roof coating project for a Northwest Ohio manufacturing facility spanned over 220,000 square feet, making it one of our more time-sensitive and logistically demanding jobs of the season. The existing roof had suffered hail damage, and with Northern Ohio’s short window for coating season, weather was a critical factor.
Thanks to a tightly coordinated team, fast mobilization and deep experience with silicone systems, we restored the roof in under two months, wrapping up just before the October weather deadline. The result: a seamless, watertight roof surface protected by a high-performance 838 Coatings system — and a client entering winter with confidence.
Watch the project: pressure washing, detailing and silicone application across a 220,000 sq. ft. plant roof.
Scope Of Work
What We Applied
01
Surface Preparation
Extensive pressure washing across the full roof surface, followed by sealing every visible fracture in the existing membrane.
02
Flashing & Penetration Detailing
838 MS sealant applied to all curb edges, stacks, penetrations and vulnerable seams to reinforce critical areas before coating.
03
Silicone Coating Application
One coat of 838 Fast One silicone at 2 gallons per square, with consistent coverage and adhesion across every roof section.
04
Verification & Warranty
Post-application pull tests returned 7 to 11 lbs, exceeding standard expectations, backed by a 10-year NDL material and labor warranty.
Challenges & Solutions
Beating A Late-Season Coating Window
Challenge
A September–October Weather Window
Solution
We mobilized quickly, secured materials in advance and pressure washed on weekends to capture every available dry day before the deadline.
Challenge
Hail Damage And Hundreds Of Penetrations
Solution
A systematic team approach sealed every penetration, reinforced weak points and confirmed thorough prep before a single gallon of silicone went down.
Results & Client Feedback
“How you practice is how you play.”— Technique Roofing crew
Despite the pressure of weather and scale, the coating adhered extremely well, with exceptional pull test results confirming strong adhesion and performance. The client was impressed not just with the finished product, but with our ability to work efficiently, safely and without disruption to daily operations.
- 220,000+ sq. ft. restored in under two months
- Pull test adhesion of 7 to 11 lbs
- Zero disruption to plant operations
- 10-year NDL material and labor warranty